Give me Shelter

On January 16, 2009, the transmitter building was set into place. Lynchburg Crane was brought in to handle the job. The concrete pad for the building was laid earlier. You can see in one pic that the concrete pouring skills by the station staff leave a little something to be desired, but the other three side are perfect.